Establishing a Timeline

Timeline

 To stay organized, and have enough time to do everything, and subbed, I’ve learned that it’s really important to create a working schedule, because the times that I did not create one, I run out of time, and had to finish my projects rushing and not in the best way, so for this project, I’m going to create a timeline to which I’m going to stick, follow, and modify (if necessary). First, I have to break down this assignment into its biggest components.

1. Choosing genre and research

  • Choose a genre (in this case action), and analyze its openings.
  • See what I can take from this openings, and use them as inspiration
  • Research about the genre’s plots and its openings

2. Planning

  • Create a plot
  • Scripting 
  • Storyboard

3. Pre-recording

  • Find a music or a song that I can include in opening (no copyright)
  • Finish editing storyboard
  • Choosing the shots, and angles
  • Set a prop

4. Production

  • Recording
  • Record Foley/ voice over (if needed)

5. Editing

  • Create credits design, and choose a font 
  • Create title and design it
  • Put the shots together, and check if should I retake some shot.

6. Revision 

  • Review current version of video and make changes if needed
  • Re-check editing

7. Creative Critical Reflection 

  • Create CCR, like a podcast, or a screencast
  • Edit it
The things that I listed are in order from first to last, but to really have time, I’ll create a timeline that’s going to be really similar, but much more specific with the dates.

Timeline

First week (19-25 January)
  • Choose a genre and research about it
  • Analyze openings of that specific genre 
  • Create a plot
  • Create 3 blogposts

Second week (26-1 February)

  • Create storyboard
  • Scripting
  • Find a song 
  • 4 blogposts
Third week (2-8 February)

  • Recording film
  • Record foley/VO
  • 4 blogposts
Fourth week (9-15 February)
  • Put shots together
  • Edit first half of film 
  • 4 blogpost
Fifth week (16-22 February)
  • Edit second half of film
  • Check for retakes
  • Create title design
  • 4 blogposts
Sixth week (23-1 March)
  • Create credits design 
  • Revise film
  • Make changes (if necessary)
  • 4 blogposts
    Seventh week (2-8 March)

    • Create CCR
    • 4 blogposts

      Eighth week (9-17 March)

      • Buffer week in case of any delays.
      • 4 blogposts

      That’s it for today bloggers! I’ll keep updating you guys on how I’m doing with the project, and blogging about it! Have a great day, and see you on the next one!😀🦾